VoltEdge Systems

Electrical remedial works and fault finding

A report that says "unsatisfactory" is only useful once the items are fixed and certified. Send us the report; we quote the remedials item by item, do the work, and issue the certificate.

For
Anyone holding an unsatisfactory report, from any contractor
You get
Itemised quotation against the report references, completion photographs, certificates
Typical start
Quotation from the report before any visit where possible
Next step
Send us your report

Who this is for

Anyone holding an unsatisfactory EICR from any contractor, facilities managers with a defect list, letting agents with a 28-day clock running, and premises with intermittent faults that nobody has traced.

Scope

Remedials from a report
Each C1, C2 and FI item priced separately so you can authorise some or all. C3 items quoted on request.
Fault finding
Tripping RCDs, intermittent loss of supply, overheating boards, nuisance tripping on new equipment: investigation charged by time at the hourly rate quoted before we attend, with a written finding.
Typical works
Board and RCBO upgrades, bonding, replacing damaged accessories, circuit re-termination, surge protection, lighting repairs.
Certification
Minor Electrical Installation Works Certificate or Electrical Installation Certificate for the work done; written confirmation of completed remedials for landlords.
Not included
Work requiring a specialist certification route outside the agreed scope, HV, fire alarm and specialist systems.

Access and shutdown planning

Most remedials need short isolations; we schedule them around your operation and tell you in advance which circuits will be off and for how long.

What you receive

What stands behind the work

  • Delivery is planned around the agreed scope, site rules, safe isolation and practical reporting.
  • Personnel and delivery partners are selected to match the agreed scope, site requirements and certification route.
  • Management oversight includes site-supervision, health-and-safety management, first-aid-at-work and access-safety training; site-specific RAMS are prepared for every job.
  • Test instrument and reporting: Megger MFT-X1 multifunction tester and CertSuite digital certification. Calibration evidence can be supplied on request.
  • Where a project requires a particular certification or supply-chain route, this is agreed before work is accepted. We do not claim memberships or accreditations that have not been confirmed for that work.

Questions we are usually asked

Can you do remedials on another contractor's report?

Yes. We work from the report's observation references so the paper trail is clear.

Do I need a new EICR after remedials?

Usually not. The remedial certificate plus the original report shows the items are closed. If the report had many limitations or FI items, a re-inspection of those parts may be sensible; we will say which.

How quickly can you attend a fault?

Contracted clients have a response window in their contract. For everyone else we fit faults around contracted work and give you the earliest date when you call; we do not promise same-day attendance, and we will say so if we cannot help in time.

Send us your report for a remedial quote