VoltEdge Systems

Landlord EICRs and rental property electrical safety

For private landlords, letting agents and, from 2025, social landlords in England. We carry out the five-yearly inspection, deliver the report in the timescales the regulations set, and quote any remedial work separately.

Regulatory content on this page was checked against the government guidance on . Re-check before relying on it.

For
Private landlords, letting agents, social landlords in England
You get
EICR per property, remedial quotation, written completion confirmation, due-date reminder
Legal clock
At least every five years; C1/C2/FI remedials within 28 days
Next step
Request an EICR quotation

What the regulations require (England)

Under the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020, as extended to the social rented sector in 2025, landlords must:

Local authorities can serve remedial notices, arrange works and recover the cost, and impose financial penalties of up to £40,000. Exemptions include leases of seven years or more, lodgers sharing with the landlord, student halls, hostels and refuges, care homes and similar accommodation.

Social housing: dates that matter

A valid report carries over: a new tenancy does not by itself trigger a new EICR if a report less than five years old with no outstanding remedial or further-investigation items exists. The new tenant must be given a copy, and the guidance recommends at least a visual inspection before the tenancy starts. We will tell you if you do not need a new report.

Scope

Inspection and testing
Fixed installation of each property to BS 7671; consumer unit, circuits, earthing and bonding, RCD protection, sampled accessories.
Report
EICR with photographs and C1/C2/C3/FI findings; next inspection date stated.
Remedials
Quoted separately; completed within the 28-day window where instructed promptly; certification issued.
Portfolio schedule
For agents and multi-property landlords: a due-date register and batching by area; per-property pricing bands and any batch minimum are agreed with each agency.
Not included
Landlord-supplied appliance checks (PAT, with an in-service inspection and testing record, available as a separate item), gas, EPC, smoke and CO alarm installation unless quoted.

Access

We work with your tenant-contact process: notice given through the agent or landlord, agreed appointment windows, ID shown on arrival, and a no-access protocol agreed in advance so a wasted visit is handled fairly.

What you receive

What stands behind the work

  • Delivery is planned around the agreed scope, site rules, safe isolation and practical reporting.
  • Personnel and delivery partners are selected to match the agreed scope, site requirements and certification route.
  • Management oversight includes site-supervision, health-and-safety management, first-aid-at-work and access-safety training; site-specific RAMS are prepared for every job.
  • Test instrument and reporting: Megger MFT-X1 multifunction tester and CertSuite digital certification. Calibration evidence can be supplied on request.
  • Where a project requires a particular certification or supply-chain route, this is agreed before work is accepted. We do not claim memberships or accreditations that have not been confirmed for that work.

Questions we are usually asked

My previous report was 'unsatisfactory'. What now?

C1, C2 and FI items must be dealt with within 28 days (or sooner if stated). Send us the report and we will quote the remedials; after completion you receive written confirmation to pass on.

Does an HMO need an EICR?

Yes. HMOs are within the regulations; only the communal areas of buildings outside a tenancy are excluded.

Do you need the tenant present?

Someone over 18 with authority to grant access must let us in; we are happy to coordinate through the agent.

Will you certify a property without testing it?

No. A report is only issued after inspection and testing, and we will not promise a satisfactory result in advance.

Request an EICR quotation Discuss portfolio support